Continent
Europe (57)
Asia (31)
Africa (2)
Americas (3)
Country
Azerbaijan (1)
Bulgaria (1)
China (1)
Germany (45)
India (2)
Canada (1)
Qatar (6)
Kuwait (3)
Lebanon (1)
Mauritius (1)
Panama (1)
Russia (7)
Saudi Arabia (4)
Czechia (1)
Turkey (7)
Hungary (1)
United Arab Emirates (6)
United States of America (1)
Egypt (1)
United Kingdom (2)
Building Function
Education (4)
Office (54)
Health (4)
Shopping (23)
High-Rise (22)
Hotel (14)
Culture (9)
Mixed-Use (29)
Sport (1)
Transport (8)
Residential (14)
Key Feature
Unitized Curtain Wall (46)
Stick System (54)
Double Skin (11)
Glass Fin (5)
Rain Screen (32)
Exhaust Air (3)
Roof (21)
Energy (8)
Security (3)
Sun Protection (34)
Geometry (16)
Innovation (8)
Main Material
Ceramic (8)
Composite (12)
Concrete (5)
Glass (71)
Metal (53)
Membrane (2)
Stone (18)
Wood (3)
Other (5)
Height
Up to 50m (49)
Up to 100m (19)
Up to 200m (15)
Up to 300m (8)
Higher (2)
Our Services
Research & Development (10)
Consultancy (80)
Engineering (15)
Specials (44)
Continuous Support (4)
Refurbishment (12)
Status
Competition (0)
In Planning (4)
Under Construction (3)
Completed (91)
Not Built (0)

Haramain High Speed Rail Station, Medina


Map 

Client

Yapı Merkezi Construction and Industry Inc.


Owner / Developer

Saudi Railways Organization


Architect
  • Foster + Partners
  • Buro Happold

Building Function

Railway Terminal


Status

Completed 12/2016


Facade Scale

approx. 20.000 m²


Height

approx. 50 m


Technical Features
  • Frame system, unitized facade elements, sheet metal cladding
  • Sunshade elements
  • Canopy

View location in Google Maps

We provided

Consultancy

The first phase after the award of the contract is of particular importance. Often some time has passed since planning and a number of changes may have occurred, the planning team has changed, user requests have been added or additional requirements are putting pressure on the budget. Priedemann checks and assesses whether all of the documents are up to date, complete, feasible and if any improvements can be made, coordinates change management and is the contact for all questions of the planning team concerning the facade.

Before the work is planned
  • Checking that the documents provided are complete
  • Comparison with possible project changes and updates
  • Determining the status quo for the start of construction
  • Checking the system components to be implemented
  • Clarification of unresolved questions, communication with the planning team
While the work is being planned
  • Priedemann checks and comments on the contractor’s structural assumptions as well as the performance in terms of energy and acoustics
  • Checking and evaluating the contractor’s work schedule
  • Checking relevant facade elements and how they interface with other trades
  • Evaluation of the contractor’s planning and system design
  • Checking of technical specifications for materials such as glass, stone etc. as well as data sheets for sealing and insulating materials, surfaces, system descriptions etc.
  • Checking and assessing the facade supply chain for compliance with the applicable guidelines as well as technical and quality standards
  • Comparison of test data with specified or actual performance data
  • Updating change management
Additional services
  • Investigation of options for production, materials and technology, if necessary making improvements whilst retaining the agreed qualities, costs and dates for implementation
  • Evaluation of facade materials that the facade manufacturer provides as an IFC (issued for construction) alternative
  • Statement on the suitability, quality and equivalence of alternative material proposals in relation to the materials in the original plans
  • Assessment and evaluation of the behavior of the products when processed

Scale does not just changes the perspective and the proportions, only in the 1:1 model can the loads a component is exposed to be tested realistically.

Usually, mock-ups are only created after being awarded to the manufacturer of a facade. We support the planning and implementation already during the planning phase in order to ensure greater reliability of planning, design and implementation at an earlier point in time.

Physical mock-ups:
  • Support and advice when carrying out facade tests
  • Control of the standards and requirements to be met, involvement in tests
  • Evaluating and commenting on the test reports
  • Recommendations for potential improvements
Visual mock-ups:
  • Support and advice on the construction of a facade sample to match the design requirements

The supervision of assembly and installation is particularly important for us, to ensure the agreed quality. Our principle is that deviations from the agreed planning must be identified at an early stage, documented and the implementation corrected. This controlling refers both to production and manufacturing as well as to the assembly on the building site:

Regular inspection of production and assembly in the factory
  • Verification of compliance with the approved design, ensuring compliance with the agreed qualities, standards and test series
  • Regular reporting on production progress; the reports contain recommendations for possible improvements as well as a list of unfulfilled services, performance arrears, defects identified
Regular inspection at the building site
  • Verification of compliance with the approved design, ensuring compliance with the agreed qualities, standards and test series
  • Inspection of examples of facade sections as reference values for determining the quality of workmanship – benchmark inspections
  • Involvement in performance tests on the facade on the building site (water impermeability, sound insulation, blower door test, etc.)
  • Random inspection of the installation work on the building site
  • Regular reporting on the installation work including the identification of discrepancies with the original planning