Handover, As-Built Documentation

 

Continent
Europe (57)
Asia (31)
Africa (2)
Americas (3)
Country
Azerbaijan (1)
Bulgaria (1)
China (1)
Germany (45)
India (2)
Canada (1)
Qatar (6)
Kuwait (3)
Lebanon (1)
Mauritius (1)
Panama (1)
Russia (7)
Saudi Arabia (4)
Czechia (1)
Turkey (7)
Hungary (1)
United Arab Emirates (6)
United States of America (1)
Egypt (1)
United Kingdom (2)
Building Function
Education (4)
Office (54)
Health (4)
Shopping (23)
High-Rise (22)
Hotel (14)
Culture (9)
Mixed-Use (29)
Sport (1)
Transport (8)
Residential (14)
Key Feature
Unitized Curtain Wall (46)
Stick System (54)
Double Skin (11)
Glass Fin (5)
Rain Screen (32)
Exhaust Air (3)
Roof (21)
Energy (8)
Security (3)
Sun Protection (34)
Geometry (16)
Innovation (8)
Main Material
Ceramic (8)
Composite (12)
Concrete (5)
Glass (71)
Metal (53)
Membrane (2)
Stone (18)
Wood (3)
Other (5)
Height
Up to 50m (49)
Up to 100m (19)
Up to 200m (15)
Up to 300m (8)
Higher (2)
Our Services
Research & Development (10)
Consultancy (80)
Engineering (15)
Specials (44)
Continuous Support (4)
Refurbishment (12)
Status
Competition (0)
In Planning (4)
Under Construction (3)
Completed (91)
Not Built (0)

KAFD, Parcel 5.07 & 5.08, Riyadh


Map 

Client

Saudi Constructioneers Est.


Owner / Developer

Rayadah Investment Company (RIC)


Architect

Omrania & Associates


Building Function

Office


Status

Completed 06/2017


Facade Scale

approx. 50.000 m²


Height

approx. 83 m


Technical Features
  • Unitized curtain wall
  • Stick system facade
  • Sunshade elements
  • Parcel 5.07 – approx. 61 m
  • Parcel 5.08 – approx. 83 m

View location in Google Maps

We provided

Consultancy

At Priedemann any project starts with the determination of the planning basis, with the facts, requirements and possibilities – no matter when we start and always together with everyone involved in the project

  • What is the design concept?
  • Which local standards apply?
  • Urban planning requirements?
  • Energy requirements?
  • Weighing up the priorities in the “magic triangle” of quality, costs and duration
  • Definition of an objective as a benchmark for all subsequent planning phases
  • Development of the evaluation criteria as expert assessors in architectural competitions

The first phase after the award of the contract is of particular importance. Often some time has passed since planning and a number of changes may have occurred, the planning team has changed, user requests have been added or additional requirements are putting pressure on the budget. Priedemann checks and assesses whether all of the documents are up to date, complete, feasible and if any improvements can be made, coordinates change management and is the contact for all questions of the planning team concerning the facade.

Before the work is planned
  • Checking that the documents provided are complete
  • Comparison with possible project changes and updates
  • Determining the status quo for the start of construction
  • Checking the system components to be implemented
  • Clarification of unresolved questions, communication with the planning team
While the work is being planned
  • Priedemann checks and comments on the contractor’s structural assumptions as well as the performance in terms of energy and acoustics
  • Checking and evaluating the contractor’s work schedule
  • Checking relevant facade elements and how they interface with other trades
  • Evaluation of the contractor’s planning and system design
  • Checking of technical specifications for materials such as glass, stone etc. as well as data sheets for sealing and insulating materials, surfaces, system descriptions etc.
  • Checking and assessing the facade supply chain for compliance with the applicable guidelines as well as technical and quality standards
  • Comparison of test data with specified or actual performance data
  • Updating change management
Additional services
  • Investigation of options for production, materials and technology, if necessary making improvements whilst retaining the agreed qualities, costs and dates for implementation
  • Evaluation of facade materials that the facade manufacturer provides as an IFC (issued for construction) alternative
  • Statement on the suitability, quality and equivalence of alternative material proposals in relation to the materials in the original plans
  • Assessment and evaluation of the behavior of the products when processed

The supervision of assembly and installation is particularly important for us, to ensure the agreed quality. Our principle is that deviations from the agreed planning must be identified at an early stage, documented and the implementation corrected. This controlling refers both to production and manufacturing as well as to the assembly on the building site:

Regular inspection of production and assembly in the factory
  • Verification of compliance with the approved design, ensuring compliance with the agreed qualities, standards and test series
  • Regular reporting on production progress; the reports contain recommendations for possible improvements as well as a list of unfulfilled services, performance arrears, defects identified
Regular inspection at the building site
  • Verification of compliance with the approved design, ensuring compliance with the agreed qualities, standards and test series
  • Inspection of examples of facade sections as reference values for determining the quality of workmanship – benchmark inspections
  • Involvement in performance tests on the facade on the building site (water impermeability, sound insulation, blower door test, etc.)
  • Random inspection of the installation work on the building site
  • Regular reporting on the installation work including the identification of discrepancies with the original planning

At Priedemann, we schedule all relevant issues and cost points right up to the handover. For acceptance, we can compile a complete package of all important documents to ensure operation and maintenance of the facade as well as a detailed digital documentation of the final performance or to check its completeness.

  • Final acceptance inspection with developers, architects and the project management team
  • Documenting the final inspection with concluding observations and further recommendations
  • Documenting the final facade details with all construction drawings and calculations of the statics and building physics
  • Handing over and compiling the operating and maintenance manuals
  • Checking that all of the documents are complete