Continent
Europe (57)
Asia (31)
Africa (2)
Americas (3)
Country
Azerbaijan (1)
Bulgaria (1)
China (1)
Germany (45)
India (2)
Canada (1)
Qatar (6)
Kuwait (3)
Lebanon (1)
Mauritius (1)
Panama (1)
Russia (7)
Saudi Arabia (4)
Czechia (1)
Turkey (7)
Hungary (1)
United Arab Emirates (6)
United States of America (1)
Egypt (1)
United Kingdom (2)
Building Function
Education (4)
Office (54)
Health (4)
Shopping (23)
High-Rise (22)
Hotel (14)
Culture (9)
Mixed-Use (29)
Sport (1)
Transport (8)
Residential (14)
Key Feature
Unitized Curtain Wall (46)
Stick System (54)
Double Skin (11)
Glass Fin (5)
Rain Screen (32)
Exhaust Air (3)
Roof (21)
Energy (8)
Security (3)
Sun Protection (34)
Geometry (16)
Innovation (8)
Main Material
Ceramic (8)
Composite (12)
Concrete (5)
Glass (71)
Metal (53)
Membrane (2)
Stone (18)
Wood (3)
Other (5)
Height
Up to 50m (49)
Up to 100m (19)
Up to 200m (15)
Up to 300m (8)
Higher (2)
Our Services
Research & Development (10)
Consultancy (80)
Engineering (15)
Specials (44)
Continuous Support (4)
Refurbishment (12)
Status
Competition (0)
In Planning (4)
Under Construction (3)
Completed (91)
Not Built (0)

Platina Building, Mumbai


Map 

Client

Vijay Associates (WADHWA) Developers


Owner / Developer

Vijay Associates (WADHWA) Developers


Architect

Shakti Parmar & Associates


Building Function

Office


Status

Completed 11/2008


Facade Scale

approx. 7.500 m²


Height

approx. 50 m


Technical Features
  • Stick system facade
  • Top hung windows, motor-operated
  • Sliding windows
  • External sunshade, lamellas, motor-operated
  • Glass lamellas

View location in Google Maps

We provided

Consultancy

At Priedemann any project starts with the determination of the planning basis, with the facts, requirements and possibilities – no matter when we start and always together with everyone involved in the project

  • What is the design concept?
  • Which local standards apply?
  • Urban planning requirements?
  • Energy requirements?
  • Weighing up the priorities in the “magic triangle” of quality, costs and duration
  • Definition of an objective as a benchmark for all subsequent planning phases
  • Development of the evaluation criteria as expert assessors in architectural competitions

Priedemann develops the facade concept for planning ready for approval – taking into account all planning principles and requirements determined up to that point, e.g. the climate plan, building technology and building statics.

  • Detailed hand-drawn sketches
  • CAD-based layout plans and CAD-guided details
  • 3-dimensional analysis of the shell of the building for complex facades
  • Selection of the materials and type of facade
  • Drafting of the facade plan on the basis of the building physics and acoustic specifications
  • Integration of fire safety and smoke extraction plans
  • Security requirements are taken into consideration
  • Collaboration on the overall design so that it can be approved
  • Joint design, joint width and depth in accordance with the building movements identified and relevant tolerances
  • Documentation in report form
  • Ongoing updating and further development of the design, cost estimate and construction scheduling
  • Support in the planning and implementation of 1:1 facade samples to ensure that the design is progressing as intended, e.g. in design-and-build processes

Priedemann sees the implementation planning as a precise simulation of the construction process and the building – in detail, digitally and, depending on the complexity, as a 3-dimensional model.

  • Guide-detail planning as CAD drawing on a scale of 1:1 with all connections to adjacent components
  • Detailed representation of the layers, components and individual components of the facade solution supplemented by material descriptions and dimensioning
  • Planning on the basis of static pre-dimensioning for the relevant facade components – glass, profiles, fixings
  • Advanced planning for the building physics and acoustics
  • The specified security and fire safety requirements are taken into consideration
  • Planning and integration of control and operating components
  • Updating costs and the construction schedule
  • Agreed plan for the materials
  • Glass specifications

For tendering and awarding contracts Priedemann defines and specifies the planned facades and details as well as the connections to adjacent components.

  • Summary of technical requirements as well as client and user specifications for construction and materials as “Technical Preliminary Remarks”.
  • Compilation of the design and additional technical criteria in coordination with the planning team
  • Drafting of the service description
  • Individual quantities and components are recorded
  • Differentiation of the various trades when awarding contracts to different contractors, clear definition of the interfaces
  • Collation of all documents in a single set of documentation